La Vista Handover Checklist: What to Inspect
A practical checklist for inspecting your La Vista or El Patio unit at handover.
Last updated:

Finishes
Check walls, floors, doors and windows against the contract specifications.
Systems
Test water pressure, drainage, electricity points and air-conditioning connections.
Paperwork
Get a signed handover report listing any snags and their repair dates.